Case Studies

CORUS TUBES
Corby, NorthamptonshireCabling

We successfully changed over a 3 node NEC Philips telephone switch with approximately 650 extensions at Corus Tubes, Corby.

A handset roll out also took place to change out analogue with digital in the main admin building covering seven floors.

Three days were allocated for the switch over and roll out, but due to excellent preparation, only two days were needed.

 

BROOMFIELD HOSPITAL
Chelmsford, Essex

After tracing out and documenting the telephone wiring around the hospital we successfully migrated 100 emergency phones from the old DX phone system onto the new & up to date system.

We then went to every handset to test that all were working okay.

There was only one fault which was corrected straight away and the customer was very happy.